 |
Building the frames
|
 |
Laminating the stem
|
 |
Frames and longitudinal structure already mounted.
The keel is being laminated in place.
|
 |
The stem and the keel already fixed.
|
 |
The hull ready to receive the plywood covering.
A thick layer of fiberglass will cover the plywood.
|
 |
The interior must be completely saturated with two coats
of epoxy.
|
 |
The bunks are placed before the deck is closed.
|
 |
The deck structure is ready to receive the plywood.
|
 |
A thick layer of fiberglass will be applied over the
plywood.
|