|
MULTICHINE
23
|
![]() |
Building the frames
|
|
Laminating the stem
|
|
|
Frames and longitudinal structure already mounted. The keel is being laminated in place.
|
|
|
The hull ready to receive the plywood covering. A thick layer of fiberglass will cover the plywood.
|
|
|
The interior must be completely saturated with two coats of epoxy.
|
|
|
The bunks are placed
before the deck is closed.
|
|
|
The deck structure is ready to receive the plywood.
|
|
|
A thick layer of fiberglass
will be applied over the plywood.
|